Adair were part of an experienced team collaborating on the multi-phase development plan for the expansion of the school. The Post 16 building is the second of four phases.
Derbyshire | Projects | Adair
Share:
  • Adair
  • Adair
  • Adair
  • Adair
Client
Spencer Academy Trust
Services
Quantity Surveying
Sector
Education
Contract
JCT Design and Build 2016
Value
Confidential
Location
Derbyshire

The scheme was formed in two parts, a substantial refurbishment of the existing Post 16 facility, and a substantial extension to increase the sixth form capacity. The main aim was to deliver a new, vibrant, and modern learning experience aimed at students from school to a university style environment. The scheme also set out to achieve a low-carbon building, both by upgrading the existing building and providing a new thermally efficient extension with low-carbon technology.